Fast and Precise Installation
To achieve high quality within the shortest possible installation time requireslongstanding experience but also that an optimum use of our machineryand equipment. Staff members responsible for installation are fullyfamiliar with all processing technologies for furnace construction,including conventional brickwork, processing of high-grade refractoryconcrete, employment of ceramic fibres and the placing of SiC materials.
Also in the maintenance, the Burwitz Group has a lot to offer. It goeswithout saying that we offer lining service - as is common for instancein the steel industry - for your pool of steel ladles, tundishes,converters and electric arc furnaces whenever this is required at aproduction site. Our experience in maintenance services has beenappreciated by our satisfied customers for more than 25 years.
Linking materials and maintenance costs relative to the costs of production ( € / ton ) of our partners is a matter of course.
Our extensive pools of machinery and other equipment guarantee simultaneousimplementation of several major orders in the refractory field. Forinstance, it is no problem to erect an entire cement plant as well as abrand new walking beam furnace at the same time.
As a matter of principle, we guarantee to our customers state-of-the-art equipment aswell as special designs for specific requirements.
For example, withthe latest shooter technology it is possible for us to carry out thenecessary gunning processes at a deep-blown hot blast furnace. This isbeing proved in more than 20 projects worldwide.
With our double-piston pumps and experienced staff, lining according to theshotcreting method is a matter of course to us. We offer our servicesin any industrial field requiring brick-lining or monolithic lining.